WATER PROOFING, OUTDOOR WATER PROOFING, BUILDING MATERIALS
- New concrete should be cured for at least 28 days and should have a pull off strength ≥1.5 N/mm².
More Details...
- New concrete should be cured for at least 28 days and should have a pull off strength 1.5 N/mm². Cement or mineral based substrates must be prepared mechanically using abrasive blast cleaning or scarifying equipment to remove cement laitance and to achieve an open textured surface.
More Details...